Iroquois Main Floor Structural Improvements

Date: Tuesday, April 14, 2015

The main floor has had new subfloor installed throughout.  All the ceiling joists have been upgraded to meet current code requirements.  Structural steel and glue lam beams have been installed as per the engineer’s specifications.  The interior partition walls are starting to take shape.  Temporary construction stairs have been installed to assist with second storey access while we wait for the custom stairs to be created.