Date: Monday, April 13, 2015

The rear roof has been removed exposing the end walls and existing ridge section.  A new subfloor has been installed for the second floor.  Temporary walls were installed to carry the front roof section.  The roof is now ready to receive the new ridge beams and supporting posts.  The exterior wall on the back of the main floor has had the brick removed and the structure of the wall has been reinforced to carry the additional weight of the second storey wall.