The Iroquois Project Updates
Thu, 08/02/2018
Completed Iroquois Main Floor
The attention to detail in the design should be your focus here. Subtle decisions have lasting impacts. The...
Read More
Thu, 01/28/2016
The original fireplace was wood burning and then converted to gas in the 1970's. The unit exhausted up the chimney which was very...
Read More
Mon, 05/25/2015
Framing of the first and second floors is now nearly completed. The roof is now on and the additional front dormer is in place. The...
Read More
Mon, 04/20/2015
The following plans illustrate the new layout planned for the Iroquois Project. The original layout was much more closed on the main floor...
Read More
Tue, 04/14/2015
The main floor has had new subfloor installed throughout. All the ceiling joists have been upgraded to meet current code requirements. ...
Read More
Mon, 04/13/2015
The rear roof has been removed exposing the end walls and existing ridge section. A new subfloor has been installed for the second floor...
Read More
Fri, 04/10/2015
New footings are required in the basement as bases for the posts that will rise through the house picking up new point loads that are...
Read More
Thu, 04/09/2015
Demolition and preparation completed. All old insulation, plumbing and electrical wiring has now been removed. All structural elements...
Read More
Wed, 04/08/2015
The Iroquois project has progressed through the demolition stage. These pictures illustrate the start of demolition. All plaster board,...
Read More
Mon, 03/30/2015
Anden Design/ Build announces a new in-house design and build project.
Address: 190 Iroquois Ave., London
Anden has purchased this old...
Read More